A-Charge A-Charge®CAMPAIGN
Free multi-unit AC charger installation campaign

Be the first model site.

Turning an entire parking lot into one payment OS is an idea that barely exists yet. A-Charge® is not a special EV corner—it is a parking OS that runs every bay, with or without a charger, on the same QR, no app, and time-based parking fees. To prove that operation in the field, we are recruiting the first model sites: up to 2 AC chargers installed free of charge, limited to the first 2 facilities.

Campaign summary

Card and payment fees are paid by I-S3. This campaign does not guarantee feasibility, unit count, cost recovery, or operational results. Terms may be adjusted or declined depending on site survey, power capacity, and facility conditions.

Not a charging corner—an upgrade for the whole lot

Not a few DC stalls, and not an EV-only corner. Bays with chargers and bays without run on the same single OS. Very few parking lots operate this combination today.

Every bay, one QR

Charging or parking-only, drivers just scan the bay QR—intake through checkout (A-Charge. Just scan.). Fees are time-based, so revenue is easier to plan.

No app, anonymous queuing

No account, no app for drivers (NO APP.). When it gets busy, anonymous digital tickets handle turns and rights.

No gates. No flap locks.

Start without installing gates, flap locks, cones, or padlocks (NO LOCKS. NO CONES.). The whole lot becomes billable while physical construction stays light.

What changes, what doesn't — A-Charge is a connection

"First model site" can sound like being a test bench. In practice, what changes on your side is far narrower than it sounds: starting A-Charge is not a construction project, but a connection that links your chargers to the cloud.

What stays the same

  • Your chargers — existing units or models you plan to buy stay as they are (OCPP-compliant)
  • Day-to-day parking operations and staff workflows
  • The look of your site — no new gates, flaps, or payment kiosks
  • Your power contract — output is auto-allocated within the intake limit

What changes

A cloud-side connection setting on a PC that links the chargers to A-Charge — plus QR signs at the bays. That is all.

Because connecting involves no physical construction, going back to your current operation is just as easy if it does not fit.

Being first does not make you a test bench — it makes you the first facility in your area to offer this convenience.

Start in the lowest-risk order (phased rollout)

You do not need to buy and wire many chargers at once. We recommend the reverse order.

  1. First, put QR codes on every bay. Bays without chargers start earning with time-based parking fees alone. At this point the lot is already one payment OS.
  2. Next, install the campaign AC chargers. The free units (up to 2) go to the longest-stay bays first.
  3. Add chargers only as demand grows. Load is shared automatically within your site power cap, so ports can grow without upsizing the utility contract.
Start in the lowest-risk order (phased rollout)

Especially strong fit for

Hotels & ryokan

Overnight hours become AC charging hours. No disruption at check-in—guests just scan the QR.

Retail facilities

Charging rides on shopping time. The more one-time visitors, the more a no-registration QR protects conversion.

Offices & company lots

Working hours become charging hours. Employee EVs and visitors run on the same QR, in one operation.

Costs after the campaign (standard system fee)

After installation, the system fee is the standard tiered rate—everything per charger, per month. Low-utilization months stay light on fixed costs.

Outside Japan, the same tiers can be set in local currency near those yen levels—e.g. about US$14 / NT$400 for the flat starting tier (examples; quoted per market). Card fees are paid by I-S3. Setup is ¥100,000 per charger in Japan (AC/DC). Construction quoted separately.

Do not judge us by A-Charge port count

Look at I-S3’s electrical construction and monitoring systems—not at how many A-Charge billing sites exist yet. A-Charge is the parking OS built on that work.

Large-scale solar

High-voltage interconnection, self-consumption, repowering, and O&M. Food-plant ~200 kW self-consumption and high-voltage ~500 kW upgrades: live sites, multiple stakeholders, electrical work done safely.

Advanced operations systems

Remote solar monitoring and 30-minute demand sizing, our own RightOS anonymous queue, and an OCPP 1.6 / 2.0.1 central system with load sharing under the site power cap. Not spreadsheets bolted on after the fact.

EV charger installs (AC through DC)

Hundreds of jobs centered on Gunma. Mostly AC (Tesla Wall Connector and similar); over 99.9% of residential jobs finish the same day. Eleven prefectures by our own visits, six in Kansai via partners (17 total). We also design turnkey facility packages that include 50 kW / 120 kW DC.

Billing sites under the A-Charge name are still being added. Installing, isolating, monitoring, and reconnecting electrical plant is I-S3’s core work.

Try it on your own phone before signing

Before any contract, you can walk through the actual user screens — from scanning the bay QR up to the payment step — on the demo page. See the no-app, no-registration experience on your own phone first.

View the user screen demo →

From application to connection

  1. Apply by email via the button below (facility name, location, bay count, business type)
  2. Site survey (power capacity, distribution board, bay layout)
  3. Configuration proposal and agreement on campaign terms
  4. QR posting at the bays, charger connection, and go-live

Raise your hand to be the first model site

Email us with your facility name, location, bay count, and business type. After checking power capacity and layout, we will propose the best configuration.

Apply for this campaign Read the detailed guide

Phone: 027-384-4646

Installation (I-S3)

A-Charge Talk to us about installing
027-384-4646Call us (weekdays 9:00-18:00 JST) Chat with us24h · AI answers first (i-s3.com)