Starting from an empty lot—what does it cost?

Reference pricing for a turnkey install on a lot with no power equipment at all—from a new grid connection to the chargers themselves. Here are three representative configurations.

Reference pricing | Tax excluded

All figures are reference prices for installations in Japan, quoted in Japanese yen.

First, the premise

This is not an invitation to invest

Installing chargers does not guarantee a profit. A-Charge is the intake system for a facility that has already decided to spend on bays or chargers, so it can run them at low cost. Yield is a number the owner calculates and takes responsibility for. After that decision, we help run the site cheaply.

Do not judge us by A-Charge port count

Look at I-S3’s electrical construction and monitoring systems—not at how many A-Charge billing sites exist yet. A-Charge is the parking OS built on that work.

Large-scale solar

High-voltage interconnection, self-consumption, repowering, and O&M. Food-plant ~200 kW self-consumption and high-voltage ~500 kW upgrades: live sites, multiple stakeholders, electrical work done safely.

Advanced operations systems

Remote solar monitoring and 30-minute demand sizing, our own RightOS anonymous queue, and an OCPP 1.6 / 2.0.1 central system with load sharing under the site power cap. Not spreadsheets bolted on after the fact.

EV charger installs (AC through DC)

Hundreds of jobs centered on Gunma. Mostly AC (Tesla Wall Connector and similar); over 99.9% of residential jobs finish the same day. Eleven prefectures by our own visits, six in Kansai via partners (17 total). We also design turnkey facility packages that include 50 kW / 120 kW DC.

Billing sites under the A-Charge name are still being added. Installing, isolating, monitoring, and reconnecting electrical plant is I-S3’s core work.

Not just new builds—existing and third-party chargers too

Send us the charger model and we will confirm compatibility.

Three representative packages

PACKAGE 1

10 AC chargers (new 50 kW grid connection)

The first step to whole-lot coverage. Hotels, retail, monthly parking.

ItemReference price (tax excl.)
AC chargers × 10¥2,200,000
System setup¥1,000,000
Electrical work (incl. new grid connection)¥2,000,000
Total (tax excl.)¥5,200,000
PACKAGE 2

50 kW DC fast charger

For short-stay sites and lots along major roads.

ItemReference price (tax excl.)
50 kW DC fast charger × 1¥2,900,000
System setup¥100,000
Electrical work (incl. new grid connection)¥3,200,000
Total (tax excl.)¥6,200,000
PACKAGE 3

120 kW DC fast charger + 10 AC chargers

A full-scale charging hub. High-voltage cubicle leaves room to grow.

ItemReference price (tax excl.)
120 kW DC fast charger × 1¥5,000,000
AC chargers × 10¥2,200,000
High-voltage cubicle¥8,000,000
System setup¥1,100,000
Electrical work (incl. utility pole installation)¥3,500,000
Total (tax excl.)¥19,800,000

How to read these figures

← Back to owner overview

Request a site survey & formal quote

Send us the address and your preferred configuration. We will check grid-connection feasibility and reply with an estimate.

Email us about A-Charge

Phone: 027-384-4646(I-S3 Co., Ltd.)

1311-1 Iizuka-machi, Takasaki, Gunma 370-0069, Japan

A-Charge Talk to us about installing
027-384-4646Call us (weekdays 9:00-18:00 JST) Chat with us24h · AI answers first (i-s3.com)