Reference pricing for a turnkey install on a lot with no power equipment at all—from a new grid connection to the chargers themselves. Here are three representative configurations.
Reference pricing | Tax excluded
All figures are reference prices for installations in Japan, quoted in Japanese yen.
Not just new builds—existing and third-party chargers too
We can replace the system on chargers already installed. Even if they run another vendor's billing system, OCPP 1.6 / 2.0.1 compatible units can switch to A-Charge without new hardware.
We can also provide the system for chargers purchased and installed through other vendors. Keep your hardware—run only the system on A-Charge.
Send us the charger model and we will confirm compatibility.
Three representative packages
PACKAGE 1
10 AC chargers (new 50 kW grid connection)
The first step to whole-lot coverage. Hotels, retail, monthly parking.
Item
Reference price (tax excl.)
AC chargers × 10
¥2,200,000
System setup
¥1,000,000
Electrical work (incl. new grid connection)
¥2,000,000
Total (tax excl.)¥5,200,000
PACKAGE 2
50 kW DC fast charger
For short-stay sites and lots along major roads.
Item
Reference price (tax excl.)
50 kW DC fast charger × 1
¥2,900,000
System setup
¥100,000
Electrical work (incl. new grid connection)
¥3,200,000
Total (tax excl.)¥6,200,000
PACKAGE 3
120 kW DC fast charger + 10 AC chargers
A full-scale charging hub. High-voltage cubicle leaves room to grow.
Item
Reference price (tax excl.)
120 kW DC fast charger × 1
¥5,000,000
AC chargers × 10
¥2,200,000
High-voltage cubicle
¥8,000,000
System setup
¥1,100,000
Electrical work (incl. utility pole installation)
¥3,500,000
Total (tax excl.)¥19,800,000
How to read these figures
All figures are reference prices for installations in Japan, quoted in Japanese yen.
All figures are reference prices (tax excluded). A formal quote follows an on-site survey.
Electrical costs vary with connection distance, grid conditions, ground, and paving. Send us photos and the approximate distance to your distribution panel, and we can give you a rough estimate before a formal on-site survey.
The monthly system fee is tiered by revenue and billed separately (see the owners page).
Charger models and counts are freely adjustable—tell us about your site first.
Adding an AC charger later runs about ¥500,000 per unit, for a site that already has power (a brand-new grid connection is quoted separately). Start with the smallest configuration, then add more once you see real usage.